Exam Details and Topics
The qualifying exam for the PMI-PBA certification consists of 200 multiple-choice questions. Out of the total amount of questions, there will be 25 unscored items that will not have an impact on the overall result. These questions are included in the test for validity purposes. The students are given 4 hours to finish all the questions. You can take your exam either in-person at the authorized Pearson VUE testing center or online from your home/office. The exam fee is $405 for the PMI members and $555 for the non-members. Currently, the test is available in the English language only. The PMI-PBA certificate should be renewed every three years by earning 60 PDUs (Professional Development Units).
To pass the PMI-PBA test on the first try, the students should gain the necessary knowledge and skills, which will help them cover all the questions in the exam. All in all, the applicants will face with the following subject areas:
Needs Assessment: The first module evaluates the expertise of the examinees in collecting and analyzing the information from different sources utilizing valuation techniques and tools to determine the value of the initiative as well as providing the clarification of the business needs and solution scope to collaborate in the designing of project objectives and goals to adjust the product with the organization’s objectives and goals. Moreover, they need to have the competence in defining or reviewing the business problem for developing a solution scope statement or providing data to design a business case. In addition, the individuals should possess the experience in utilizing the elicitation techniques to determine stakeholder values concerning the product and give a baseline for prioritizing needs.
Planning: The next domain focuses on the proficiency of the learners in reviewing the business case, project objectives, and goals to present the context for the business analysis activities, utilizing the traceability techniques and tools to determine the strategies for requirements traceability, and define the level of traceability needed to validate & monitor the requirements as well as identifying roles, stakeholders, and communication protocols, responsibilities, and methods to develop the requirements management plan to elicit, analyze, document, manage, and approve requirements to establish a roadmap for performing the expected solutions. Besides that, it checks the skills in identifying channels for communicating processes and requests for managing changes to select methods for requirements change control and determine the standard protocols for incorporation into the change management plan.
Analysis: As for this part, the test takers need to show their competence in utilizing the individual and group elicitation techniques to identify the requirements for discovering and capturing the requirements with supporting details. Furthermore, they need to have the proficiency in analyzing, decomposing and elaborating the requirements utilizing various techniques, such as data and process modeling, interface analysis, and dependency analysis to clarify product capabilities & options. In addition, the examinees should possess the expertise in utilizing the valuation and decision-making techniques to estimate product capabilities & options, and determine the rejected, deferred, or accepted requirements as well as allocating deferred or accepted requirements to create a requirements baseline, and utilizing the decision-making techniques to get sign-off on requirements baseline, facilitate stakeholder agreement, and gain stakeholder approval.
Monitoring and Traceability: The next subject area evaluates the skills of the applicants in capturing the requirements’ relationships, sources, and status to give evidence that the requirements are fulfilled as stated, monitoring the requirements throughout their lifecycles to ensure the proper supporting requirements artifacts are reviewed, produced, and approved at every period in the lifecycle as well as updating a requirement’s status as it runs through its lifecycle phases by interacting with proper stakeholders and documenting changes in the traceability tool to track requirements towards the end. Moreover, it checks their competence in communicating the status of the requirements to the project manager and other stakeholders utilizing communication methods to keep them informed of requirements risks, conflicts, issues, changes, and overall status.
Evaluation: The last section checks the experience of the students in defining if the solution meets the requirements by validating the solution’s test evidence toward the requirements acceptance standards as well as analyzing and communicating the solution's identified deltas and gaps utilizing the quality insurance methods & tools and to equip the stakeholders to determine differences between developed solution, requirements, and solution scope. Additionally, the applicants need to possess the proficiency in evaluating the expanded solution utilizing valuation techniques to define how the solution satisfies the value proposition and business case.
NEW QUESTION # 80
A business analyst from Company A has been assigned a project to document and identify requirements for a new commercial software implementation. The first step is to break down the business analysis deliverables into activities and tasks. Then, the business analyst will add an estimate of the time needed to complete the work.
Which type of estimation technique is the business analyst using?
- A. Parametric
- B. Bottom-up
- C. Analogous
- D. Delphi
Answer: B
Explanation:
Explanation
The business analyst is using a bottom-up estimation technique, which involves breaking down the work into smaller components and estimating the time and resources needed for each component. Then, the estimates are aggregated to obtain the total estimate for the project. Bottom-up estimation is more accurate and reliable than other techniques, but it also requires more time and effort. : PMI Professional in Business Analysis (PMI-PBA)
Examination Content Outline1, page 15; Business Analysis for Practitioners: A Practice Guide2, page 85.
NEW QUESTION # 81
A project team has been assembled to reduce production costs. The business analyst is working with the project team to review and approve requirements. A stakeholder from the assembly line area has an issue with one of the requirements since it is dependent on using existing equipment that is set to be retired within the next six months.
Which of these techniques would the business analyst use to manage issues identified by stakeholders with requirements to ensure that those issues are resolved?
- A. Interviews
- B. Problem tracking
- C. Process modeling
- D. Estimation
Answer: B
Explanation:
Explanation
Explanation/Reference: https://www.wisdomjobs.com/today-walkins
NEW QUESTION # 82
The project team is working on test scripts to test a solution. Which source can be used for building tests of end-to-end business processes across business functions and systems?
- A. Feature model
- B. Context diagram
- C. Use case
- D. Prototype model
Answer: C
Explanation:
Explanation
A use case is a technique that describes how an actor interacts with a system to achieve a goal or perform a task. A use case consists of a main scenario and possible alternative scenarios that capture the normal, exceptional, and error flows of events. A use case can be used as a source for building tests of end-to-end business processes across business functions and systems, as it provides a comprehensive and realistic view of the expected behavior and outcomes of the solution. A use case can also help to verify and validate the functional requirements and acceptance criteria of the solution. References: PMI Professional in Business Analysis (PMI-PBA)
Examination Content Outline1, page 20; Business Analysis for Practitioners: A Practice Guide2, page 99.
NEW QUESTION # 83
A business analyst is working on a system enhancement project and has completed the requirements according to the requirements management plan. The business analyst is now ready to request approval from the stakeholders.
How should the business analyst obtain approval?
- A. Create and maintain an audit history log of changes to requirements.
- B. Conduct a formal or informal review of the requirements.
- C. Provide a defect tracking log for review.
- D. Send an email requesting approval of requirements.
Answer: B
NEW QUESTION # 84
Which tool is the most appropriate to aid in development of measurable and actionable requirements for a new project?
- A. Entity relationship diagram
- B. Use case diagram
- C. Network diagram
- D. Activity-on-node diagram
Answer: B
NEW QUESTION # 85
A company is in the final phases of implementing a project for a client. Which tool or technique could the business analyst use to iteratively validate the solution?
- A. Expected vs. actual costs
- B. Schedule variance
- C. Quality variance
- D. Expected vs. actual results
Answer: A
NEW QUESTION # 86
A sponsor requests a new requirement. The business analyst explains that most of the information needed for this requirement does not exist and that the requirement cannot be implemented. The business analyst recommends deferring the requirement until the needed information is available and then adding it to a subsequent project. The sponsor agrees.
What should the business analyst do next?
- A. Bring the subsequent project to the change control board (CCB).
- B. Communicate that the status of this requirement has changed.
- C. Ask the stakeholder to review the requirement before any other action is taken.
- D. Mark the requirement as complete so that it is not forgotten.
Answer: B
NEW QUESTION # 87
A business analyst is documenting the acceptance criteria to support a minor modification in a user portal. The analyst submits the criteria for review, but it is deemed incomplete and returned.
What could have caused the documentation to be returned?
- A. The analyst utilized user stories as a requirements document tool.
- B. The analyst performed forward and backwards traceability.
- C. The analyst did not include the scope document in the acceptance criteria paperwork.
- D. The analyst failed to gather any baseline information.
Answer: C
NEW QUESTION # 88
A company has completed a major project within time. cost, and scope and satisfied high-level quality standards and marketing requests. However, the product was considered a complete failure by shareholders and the market due to low return on investment From the business analysis perspective, the main reason for this business failure was a failure to:
- A. establish measurable success criteria in the business case
- B. set the product positioning
- C. review and evaluate market expectations
- D. gather the appropriate usability requirements
Answer: A
NEW QUESTION # 89
The sales team of a company has won a time-and-malerial project. The business analyst discovers that the sales team has underestimated the required budget and schedule Which course of action should the business analyst take?
- A. Accept the contract, and deliver only the requirements that fit within the budget and schedule.
- B. Develop a requirements baseline document and use it to negotiate the scope in the contract.
- C. Accept the contract, and then notify the customer about the potential for a cost overrun.
- D. Refrain from working on the project and request that the customer cancel the contract.
Answer: B
NEW QUESTION # 90
A business analyst has been asked to investigate a problem. This investigation will provide input towards developing a business case. The business analyst wants to first understand the company's current business processes.
Which technique should the business analyst use?
- A. MoSCoW
- B. RACI matrix
- C. User stories
- D. Observation
Answer: C
NEW QUESTION # 91
A company has just finished the development work for a new software sales tracking application and is in the process of validating that the new application meets all of the acceptance criteria defined for the business requirements. During the validation process, a stakeholder discovers that the application does not provide the selection criteria needed to produce the sales volume reporting required by the company's financial department. The business analyst for the project determines that the selection criteria needed was not specified in the system requirements or design specifications.
Which of the following tools and/or techniques might be used by the business analyst to determine how the selection criteria requirement was missed?
- A. Cause and effect diagram, brainstorming, and/or the Five Whys
- B. Root cause analysis, fishbone diagram, and/or the Five Whys
- C. Root cause analysis, problem tracking, and/or benchmarking
- D. Scope modeling. Ishikawa diagram, and/or the Five Whys
Answer: B
NEW QUESTION # 92
A business analyst is discussing the acceptance criteria for a new measurement system with the operations manager. The operations manager is particularly concerned about the accuracy of the new system because mistakes in data measurements could be extremely costly to fix.
Which of the following is the best strategy to define the appropriate acceptance criteria?
- A. Clearly define the maximum acceptable error rate for the new system.
- B. Ask the operations manager to formally accept the requirements documents.
- C. Quantify the risks associated with the measurement errors and update the risk register.
- D. Plan a training session for the new system before it is handed over to the operations manager.
Answer: A
Explanation:
Explanation/Reference:
NEW QUESTION # 93
A business analyst is trying to complete the requirement documentation of a project and finds that the developers have started development. The business analyst should first facilitate the:
- A. requirements gathering workshops with the stakeholders.
- B. requirements validation with the testers.
- C. requirements sign-off with the customer.
- D. requirements acceptance with the customer.
Answer: C
Explanation:
Explanation
The requirements sign-off is a process that involves obtaining the formal approval and acceptance of the requirements from the customer and other stakeholders. The requirements sign-off confirms that the requirements are clear, complete, correct, and consistent, and that they meet the customer's needs and expectations. The requirements sign-off also establishes a baseline for the development and testing of the solution, and serves as a reference point for managing changes and resolving issues. The business analyst should first facilitate the requirements sign-off with the customer before the developers start development, to ensure that the requirements are agreed upon and validated by all parties, and to avoid rework, delays, and conflicts later in the project. References: PMI Professional in Business Analysis (PMI-PBA)
Examination
Content Outline1, page 18; Business Analysis for Practitioners: A Practice Guide2, page 92.
NEW QUESTION # 94
A stakeholder wants to modify an existing feature. Which of the following would be used to determine the scope of the change on the product?
- A. Sequence diagram
- B. Requirements traceabihty matrix
- C. Requirements attributes table
- D. Project schedule and cost baseline
Answer: B
NEW QUESTION # 95
The document that defines the process for managing requirements revisions is the:
- A. communications management plan.
- B. scope management plan.
- C. change management plan.
- D. project management plan.
Answer: C
NEW QUESTION # 96
The stakeholders for a newly approved project are subject matter experts who are very knowledgeable in the client's business and will provide the project requirements. The project team scheduled separate sessions with each subject matter expert to identify and prioritize the requirements.
Which technique is being used?
- A. Brainstorming
- B. Workshop sessions
- C. Delphi technique
- D. Idea and mind mapping
Answer: B
Explanation:
Workshop sessions are a technique to elicit, analyze, and prioritize requirements by bringing together a group of stakeholders, such as subject matter experts, to collaborate and reach a consensus. Workshop sessions can be used to identify and prioritize the requirements for a newly approved project. The other techniques are not suitable for this purpose. Delphi technique is a technique to obtain expert opinions anonymously and iteratively until a consensus is reached. Brainstorming is a technique to generate a large number of ideas or solutions in a short time. Idea and mind mapping is a technique to visually organize ideas or information using diagrams or graphs. References: PMI-PBAExamination Content Outline, page 10; PMI-PBA Reference List, page 1, BABOK Guide v3, page 50.
NEW QUESTION # 97
Once the requirements are compared to internal and external quality standards, what should the business analyst do next?
- A. Baseline the requirements.
- B. Communicate the requirements to stakeholders.
- C. Ensure that the requirements are validated.
- D. Set the priority of the requirements.
Answer: C
Explanation:
Explanation
The next step that the business analyst should take after comparing the requirements to internal and external quality standards is to ensure that the requirements are validated. Validation is a process that confirms that the requirements align with the business objectives, stakeholder needs, and expected value of the project.
Validation also ensures that the requirements are feasible, acceptable, and testable. Validation can be performed by using techniques such as reviews, walkthroughs, inspections, or demonstrations. Validation can help to identify and resolve any errors, gaps, or conflicts in the requirements before they are approved and implemented. Setting the priority of the requirements is not the next step that the business analyst should take after comparing the requirements to internal and external quality standards, as it is a process that determines the order and importance of the requirements based on their value, risk, urgency, or dependency. Priority can be set before or after comparing the requirements to quality standards, but it does not verify or confirm that the requirements meet the stakeholder expectations or project goals. Communicating the requirements to stakeholders is not the next step that the business analyst should take after comparing the requirements to internal and external quality standards, as it is a process that involves sharing and presenting the requirements to relevant stakeholders for feedback, approval, or implementation. Communication can be done before or after comparing the requirements to quality standards, but it does not check or ensure that the requirements are aligned with the business objectives or deliver value to the stakeholders. Baselineing the requirements is not the next step that the business analyst should take after comparing the requirements to internal and external quality standards, as it is a process that establishes an agreed-upon version of the requirements as a reference point for further changes or development. Baselineing can be done only after validating and approving the requirements, as it implies that they are complete, correct, clear, and consistent. References: Business Analysis for Practitioners: A Practice Guide 1, page 113-114; PMI Professional in Business Analysis (PMI-PBA) Examination Content Outline 2, page 17.
NEW QUESTION # 98
A company is developing a new e-commerce platform to enter a new market segment. Development is well under way when the government issues a new set of regulations.
Which course of action should the business analyst take?
- A. Check the traceability matrix to identify affected use cases.
- B. Evaluate if the new set of regulations is aligned with the business case.
- C. Evaluate the impact of the change on the project schedule.
- D. Obtain management sign-off on the new set of regulations.
Answer: C
NEW QUESTION # 99
A stakeholder requests to add new critical requirements the day before the scheduled baseline requirements approval meeting. The stakeholder insists that these requirements must be taken into account despite time and budget constraints.
What is the most effective way to manage this situation?
- A. Postpone the baseline approval meeting, analyze the impact, and schedule a new meeting to discuss dependencies and priorities with stakeholders.
- B. Share the new requirements with all stakeholders and ask them to submit their comments before the meeting.
- C. Discuss the change with stakeholders during the baseline approval meeting and ask them to approve the new baseline.
- D. Ask for more resources to manage this change and justify these additional resources with the value the change will give to the company.
Answer: B
Explanation:
Explanation
According to the PMI Guide to Business Analysis, one of the best practices for managing changes to requirements is to communicate them to all relevant stakeholders and solicit their feedback before approving or rejecting the change request. This ensures that the impact of the change is understood and agreed upon by all parties, and that the change does not introduce any conflicts or inconsistencies with the existing requirements. By sharing the new requirements with all stakeholders and asking them to submit their comments before the meeting, the business analyst can facilitate a constructive discussion and reach a consensus on how to proceed with the change request. References: PMI Guide to Business Analysis, page
287-288.
NEW QUESTION # 100
When eliciting requirements, a good lime to consider using the interviewing method is when:
- A. there is not enough time to gather requirements from many different sources.
- B. there are communication challenges among stakeholders.
- C. attempting to obtain sign-off on requirements from stakeholders.
- D. assembling a requirements traceability matrix.
Answer: B
NEW QUESTION # 101
A company is awarded a contract to design and build a custom product. The contract references a detailed technical specification. What is the best action to take to ensure the design meets customer requirements?
- A. Develop a test plan to verify that the product meets the performance requirements in the technical specification.
- B. Generate a design package for the product and ask the customer to verify that the design meets his or her technical needs.
- C. Create a system requirements verification matrix to trace the design to the technical requirements and include verification methods.
- D. Conduct a one-on-one interview with each member of the technical team to ensure that they understand the customer's specification.
Answer: A
Explanation:
The best action to take to ensure the design meets customer requirements is to create a system requirements verification matrix to trace the design to the technical requirements and include verification methods. A system requirements verification matrix is a document that maps the design elements to the system requirements, and specifies the methods and criteria for verifying that the design satisfies the requirements.
Verification methods can include inspection, analysis, demonstration, or testing. A system requirements verification matrix can help the business analyst and the project team to ensure the quality and completeness of the design, and to avoid any errors, gaps, or inconsistencies. References: PMI Professional in Business Analysis (PMI-PBA)Examination Content Outline1, page 20; Business Analysis for Practitioners: A Practice Guide2, page 100.
NEW QUESTION # 102
Change control systems include provisions to implement changes without formal review in the event of an emergency. When this provision is utilized:
- A. changes must still be documented and captured.
- B. changes can be applied without further managerial involvement.
- C. the risk associated with the change is not evaluated.
- D. a change control board should be established
Answer: B
NEW QUESTION # 103
A business analyst is ready lo begin requirements elicitation; however, stakeholders are not available to participate for another two weeks. Which elicitation technique should the business analyst use during this time?
- A. Document analysis
- B. Cost-benefit analysis
- C. Brainstorming
- D. Benchmarking
Answer: A
NEW QUESTION # 104
......