
Latest Huawei H31-341 First Attempt, Exam real Dumps Updated [Oct-2022]
Get the superior quality H31-341 Dumps Questions from ExamCost. Nobody can stop you from getting to your dreams now. Your bright future is just a click away!
NEW QUESTION 30
During the configuration of the E-LAN, the "MAC Address Learning Mode" can be set to SVL and IVL. SVL is a stand-alone VLAN learning, and IVL is a shared VLAN learning.
- A. FALSE
- B. TRUE
Answer: A
NEW QUESTION 31
The working mode provided by the line fiber quality monitoring function does not include _____.
- A. Manual mode
- B. Intra-office mode
- C. Automatic mode
- D. Near-end mode
Answer: C
NEW QUESTION 32
Which of the following statement about the MPLS-TP OAM level is correct?
- A. Section is the service layer of PW, PW is the service layer of Tunnel, and Tunnel is the service layer of Service.
- B. Tunnel is the service layer of PW, PW is the service layer of Service, and Service is the service layer of Section.
- C. Service is the service layer of the PW, PW is the service layer of the Tunnel, and Tunnel is the service layer of the Section.
- D. Section is the service layer of the tunnel, Tunnel is the service layer of the PW, and PW is the service layer of the Service.
Answer: D
NEW QUESTION 33
Which of the following are not part of the 400G originating modulation technology?
- A. Advanced oDSP algorithm
- B. Multi-carrier generation and multiplexing
- C. High-order modulation (xQAM)
- D. FDDM/Nyquist spectrum compression technology
Answer: A
NEW QUESTION 34
The OTS path refers to the physical fiber connection between two adjacent OM/OD/OA on the main optical path.
- A. FALSE
- B. TRUE
Answer: A
NEW QUESTION 35
When the grooming service level of the line board is ODUflex, which of the following protection schemes can be supported?
- A. ODUk SNCP
- B. SW SNCP
- C. ODUk SPRing protection
- D. Tributary SNCP
Answer: B
NEW QUESTION 36
For a 10G OTU board, the receiving end optical module uses PIN module. Which of the following receiving powers is in the normal receiving range of the board?
- A. -9dBm
- B. 19dBm
- C. -19dBm
- D. 9dBm
Answer: A
NEW QUESTION 37
Which of the following is a part of the optical layer in the OTN frame structure? (Multiple Choice)
- A. ODUk
- B. OCh
- C. OPUk
- D. OMS
Answer: B,D
NEW QUESTION 38
Which of the following ROADM boards have WSS optical modules?
- A. WSM9
- B. RDU9
- C. WSD9
- D. WSMD9
Answer: A
NEW QUESTION 39
VPLS (Virtual Private LAN Service) is a Layer 2 VP technology that simulates a local area network.
- A. FALSE
- B. TRUE
Answer: B
NEW QUESTION 40
Which of the following description of the DM12 board are correct? (Multiple choice)
- A. Electrical signal input and output interfaces for DDN, Unframed E1 and sub-rate services
- B. One DX1 board can be used with two DM12
- C. Access the NX6bit/s and sub-rate service signals through the DB28 connector on the DM12 board.
- D. Accessing G.703 64 kbit/s co-directional service signals through the DB44 interface on the DM12 board
Answer: B,C,D
NEW QUESTION 41
Which of the following description are wrong about the path method to create a Client path?
- A. The creation or search of a new path must be possible if its upper service layer path already exists.
- B. Select the "Activate" checkbox. After the path is successfully created, it will be delivered to the NE layer. Otherwise, the path configuration text will only be saved on the network management side.
- C. If the route to be automatically calculated is different from the planned path, you can set the "constrained node" or "must pass through the node" to perform routing constraints.
- D. Create a client service path by using the path method. After the creation, the optical layer OCh path is automatically generated to reduce the secondary teaching of the path creation.
Answer: D
NEW QUESTION 42
The user-oriented interface and the interface for the transport network of the E-Line service are
____ and _____.
- A. UNI, UNI
- B. NNI, UNI
- C. UNI, NNI
- D. NN, NNI
Answer: C
NEW QUESTION 43
Which of the following description of the evolutionist in the mainstream SDN model in the industry is correct? (Multiple Choice)
- A. Try to preserve and reuse existing routing protocols and IP network technologies
- B. Control flexibility is moderate and open is not complete
- C. Make full use of existing equipment and achieve fast
- D. Device programmable, open northbound API interface
Answer: A,B,C,D
NEW QUESTION 44
For the MSTP equipment, the pass-through mode is used for VC-4 services by default, and the termination mode is used for VC12/VC3 services by default.
- A. True
- B. False
Answer: A
NEW QUESTION 45
The main application scenarios for board compatible replacement are (). (Multiple Choice)
- A. Replacement board
- B. Change the board IP
- C. Change the board ID
- D. Expanding the board
Answer: A,C,D
NEW QUESTION 46
When the cross-board is configured with 1+1 hot backup, in the case of normal switching, the replacement of the cross-clock board does not affect the packet service.
- A. FALSE
- B. TRUE
Answer: B
NEW QUESTION 47
Which of the following SOM systems is not monitored?
- A. Receive OTU input optical power
- B. Light performance flatness
- C. Main light path performance
- D. Type of originating FEC
Answer: D
NEW QUESTION 48
The following limitations of alarm and performance analysis methods are: (Multiple Choice)
- A. When some faults occur, there may be no obvious alarms or performance events reported, and sometimes no alarms or performance events are found.
- B. In the case of complex networking, service, and fault information, many alarms and performance events may occur along with the occurrence of faults. Due to too many reports and performance events, maintenance personnel are unable to analyze.
- C. The network administrator cannot obtain any alarms, time, and historical alarms of the device.
- D. Field maintenance personnel cannot understand the current health of the equipment.
Answer: A,B
NEW QUESTION 49
When creating an electric layer path, one RX/TX port can only establish a connection with one optical channel of the clientLP port.
- A. FALSE
- B. TRUE
Answer: A
NEW QUESTION 50
In the scenario where the non-convergence OTU processes OTN standard signals, both A and B are WDM sites. After receiving the OTUk_TIM alarm on the client side, the OTU board at station A sends the OTUk_BDI alarm to the upstream. When the TIM follow-up action is disabled, the alarm is no longer transmitted to the downstream. When the TIM follow-up action is enabled, an SF event is generated. The WDM side of the OTU board at station B reports the ODUk_PM_AIS alarm, and the ODUk_PM_AIS alarm is transmitted downstream. The client equipment reports this alarm. After the WDM side of the OTU board at station B receives the OTUk_TIM alarm and the TIM follow-up action is disabled, the alarm is no longer transmitted to the downstream. When the TIM follow-up action is enabled, an SF event is generated. After the client side of station B processes the SF event, the client equipment reports the ODUk_PM_AIS alarm.
- A. True
- B. False
Answer: A
NEW QUESTION 51
......
Guaranteed Success with Valid Huawei H31-341 Dumps: https://pass4sure.examcost.com/H31-341-practice-exam.html

