NEW QUESTION # 17
The iDRAC is listening for its IP address on its dedicated network port which was configured.
Which connection method(s) can a server administrator use to remotely log in to the iDRAC, even while the server is powered off?

  • A. Dell Tools via DRM
  • B. Web GUI and DRM
  • C. Dell Tools via REPOMAN
  • D. Web GUI and SSH CLI

Answer: D


NEW QUESTION # 18
Which sections are included in the iDRAC Troubleshooting tab?

  • A. Post Code, Diagnostics, and Video capture
  • B. Video capture, Post Code, and Last crash screen
  • C. Diagnostics, Last crash screen, and Post Code
  • D. Last crash screen, Video capture, and, Diagnostics

Answer: B


NEW QUESTION # 19
A server has a dead system board that a technician must replace. After replacing the new system board the technician finds that the user did not back up the server profile, although they did configure the Parts Replacement policy to restore the configuration and firmware revisions for any replaced parts.
After powering on the server with the new system board, the Easy Restore feature displays a window asking if the Easy restore configuration needs to be restored to the system board.
As the Parts Replacement policy had already been configured, the technician selects YES at the Easy Restore screen knowing that the parts Replacement policy will restore the remaining configurations. After powering on the server, the technician then finds that the parts not covered by Easy Restores have not been reconfigured.
What caused the reconfiguration process to stop?

  • A. The technician forgot to move the vFlash SD card from the old system board to the new system board
  • B. The technician did not back up the server profile upon arrival and before installing the new system board
  • C. Easy Restore overrides the Parts Replacement policy
  • D. Configuration data used by the Parts Replacement policy was stored in the Lifecycle Controller on the original system board

Answer: D


NEW QUESTION # 20
A technician is remotely installing ESXi 6.0 on a PowerEdge R640 in BIOS boot mode. The system has dual internal SD cards. After the OS is installed, the system reboots and shows an error screen with the following message: "No boot device found" What should the technician do to resolve this issue?

  • A. Set the boot made from BIOS to UEFI
  • B. Reseat the SD cards and try to boot to them again
  • C. Enable vFlash in iDRAC web GUI
  • D. Change the Hard Disk Drive Sequence

Answer: C


NEW QUESTION # 21
A technician is replacing a fan on a mission critical PowerEdge R740 server that needs to stay operational. The server has no LCD.
How can the technician determine which fan needs to be replaced?

  • A. Run embedded diagnostics to locate the failing fan
  • B. Remove the chassis cover and observe a fan with an amber LED
  • C. Access the Lifecycle Controller, navigate to the System > Cooling section to locate the failing fan number
  • D. Use the iDRAC GUI to locate failing fan number

Answer: D


NEW QUESTION # 22
Which application reduces the manual effort to update 500 Dell EMC PowerEdge R750 servers?

  • A. OpenManage Enterprise
  • B. OpenManage Server Administrator
  • C. Lifecycle Controller
  • D. iDRAC9

Answer: A


NEW QUESTION # 23
If a server does not have an OS installed which two can be used to start a SupportAssist collection?
(Select 2)

  • A. LifeCycle Controller
  • B. Front LCD
  • C. iDRAC
  • D. System BIOS
  • E. OMSA

Answer: A,C


NEW QUESTION # 24
What must be done before upgrading OMSA from the 32-bit to the 64-bit version?

  • A. Save the license file
  • B. Uninstall the earlier version
  • C. Back up the configuration
  • D. Disable UAC

Answer: B


NEW QUESTION # 25
A customer wants to change the PSU configuration to a 2+0 with PSU2 as the primary. Use the simulator to complete this task in the iDRAC UI.

Answer:

Explanation:
See the Explanation for Step by Step solution.
Explanation:
To change the Power Supply Unit (PSU) configuration to a 2+0 setup with PSU2 as the primary in the iDRAC interface, follow these steps:
Step-by-Step Guide:
* Navigate to Power Management Settings:
* In the iDRAC interface, go to the Configuration tab at the top.
* Select Power Management from the dropdown options.
* Locate the Power Configuration Section:
* Within the Power Management settings, look for a section labeled Power Configuration or Power Supply Configuration.
* Select the Redundancy Policy:
* Change the Redundancy Policy to 2+0. In this configuration, there will be no redundancy, and both power supplies will be active but configured as independent power sources without failover.
* Set PSU2 as the Primary PSU:
* Locate the option to designate the Primary PSU. Select PSU2 as the primary power source.
* This setting ensures that PSU2 will handle the primary power load under normal conditions.
* Apply and Save Changes:
* Once you have made these changes, click Apply or Save to confirm the new configuration.
* The interface may prompt for confirmation, after which the settings will be saved, and PSU2 will become the primary power supply under a 2+0 configuration.
* Verify Configuration:
* Review the updated settings to confirm that PSU2 is now set as primary and that the redundancy policy is 2+0, meaning only PSU2 is actively providing power without a secondary backup.
By following these steps in the iDRAC simulator, you will set up PSU2 as the primary power source with no redundancy, ensuring a 2+0 configuration. This setup will leverage PSU2 exclusively without automatic failover to another power supply.


NEW QUESTION # 26
A technician has replaced a network daughter card (NDC) with a different, supported NDC.
Using the Lifecycle Controller, what can they do to verify that the new NDC is present?

  • A. View System Information from System Setup > Advanced Hardware Configuration > System BIOS Select Configure NDC in Device Settings
  • B. Verify Hardware Inventory License has been imported
    Verify Current Inventory form Hardware Inventory
  • C. View Current Inventory from Hardware Inventory
    Verify Collect System Inventory on Restart Option (CSIOR) is enabled
  • D. View Factory Shipped Inventory from Hardware Inventory
    Select Import NDC MIB

Answer: C


NEW QUESTION # 27
A technician is using the default installation of iSM.
Where can they find the replicated LC logs using the Windows Event Viewer?

  • A. Security
  • B. System
  • C. Forwarded Events
  • D. Application

Answer: B


NEW QUESTION # 28
Exhibit.

A customer notices that an indicator on the left control panel of the PowerEdge Server has turned solid amber.
What does this indicate?

  • A. PCIe card experiences an error.
  • B. PCIe card is present.
  • C. PCIe card temperature is normal.
  • D. PCIe card performing a firmware update.

Answer: A

Explanation:
Dell PowerEdge servers are equipped with various LED indicators on the left control panel to provide immediate visual feedback about the server's status and component health. These indicators help in quickly identifying and troubleshooting issues without needing to access the system logs immediately.
Analyzing the Visual Indicators (Server Troubleshooting - 32%)
As per the "Server Troubleshooting" section, one of the key skills is to "Analyze the visual indicators on server components - system ID, PSU, and BLINK." Color Codes and Their Meanings
* Solid Green Light: Indicates normal operation.
* Blinking Green Light: Indicates activity (such as data transfer).
* Solid Amber Light: Indicates a fault or error condition.
* Blinking Amber Light: Indicates a critical error or failure.
Application to the PCIe Card Indicator
In this scenario, the customer notices that an indicator on the left control panel has turned solid amber.
Specifically, this indicator is associated with the PCIe card.
* Option A: "PCIe card is present."
* Presence is usually indicated by a solid green light, not amber.
* Option B: "PCIe card performing a firmware update."
* Firmware updates are often indicated by blinking lights but typically not solid amber.
* Option C: "PCIe card temperature is normal."
* Normal temperature conditions would not trigger an amber light; instead, they would maintain a solid green light.
* Option D: "PCIe card experiences an error."
* A solid amber light directly correlates with an error condition in the component.
Conclusion
Given the meaning of the solid amber indicator and its association with error conditions in Dell PowerEdge servers, the correct interpretation is that the PCIe card is experiencing an error.
Dell Operate References
* Server Components (26%): Understanding server components like PCIe cards is crucial.
* Server Troubleshooting (32%): Analyzing visual indicators is a key troubleshooting step.
* Analyze the visual indicators on server components: Knowing the significance of LED colors aids in swift problem identification.


NEW QUESTION # 29
A Dell EMC PowerEdge 14G server with an add-on bezel is in No POST No Video condition. iDRAC is currently inaccessible.
Which component will provide the system status and error messages?

  • A. BIOS
  • B. LCD panel on the bezel
  • C. Lifecycle Controller
  • D. iDRAC Direct 2.0

Answer: B


NEW QUESTION # 30
A systems engineer needs to configure a RAID volume that combines disk striping across multiple disks with parity for data redundancy. Parity information is stored once and on each disk.
What RAID level does the engineer need to configure?

  • A. RAID 1
  • B. RAID 6
  • C. RAID 5
  • D. RAID 3

Answer: C


NEW QUESTION # 31
A technician needs to repurpose a Dell EMC PowerEdge server. The server has dual processors with 18 cores each The OS only "sees" 24 threads in total.
Which setting should the technician change in Processor Settings in the System BIOS?

  • A. Virtualization Technology
  • B. Number of Cores per Processor
  • C. System Profile
  • D. HyperThreading

Answer: B


NEW QUESTION # 32
What operating system supports the last crash tool in iDRAC?

  • A. ESXi
  • B. MS Windows
  • C. Unix
  • D. SUSE Linux

Answer: D


NEW QUESTION # 33
What is required for iDRAC Direct 2.0 to connect with IDRAC9 interfaces such as RACADM and WSMAN?

  • A. Micro-AB USB
  • B. Ethernet cable
  • C. NFC connection
  • D. Wi-Fi connection

Answer: A


NEW QUESTION # 34
A technician is experiencing a compatibility issue that causes network disconnects between the iDRAC firmware and an application that is running.
The iDRAC must be rolled back to the last working version. The Enterprise licensed server cannot be rebooted outside scheduled maintenance windows. The next scheduled window is one month away.
Where should the technician perform the Firmware Rollback?

  • A. Repository Manager
  • B. iDRAC GUI
  • C. Lifecycle Controller
  • D. Dell System Update Utility

Answer: B


NEW QUESTION # 35
The customer implemented ten Dell PowerEdge R660 servers in their data center. The environment also has two MX7000 chassis. The system administrator requires a management application that can help holistically manage and monitor the storage, server, and network environment.
What would be the recommended solution?

  • A. Group Manager
  • B. iSM
  • C. OME
  • D. OMSA

Answer: C

Explanation:
Selecting a Management Application for Holistic Management of Dell PowerEdge Servers and MX7000 Chassis Server Management and Configuration Tools (14%)
* Explain the management interface options - LCC, racadm, OMSA, iSM, OME System Administration (18%)
* Configure BIOS, Storage, virtual media, networking, user access, lockdown mode, and group management Understanding Customer Requirements
* Environment:
* Ten Dell PowerEdge R660 servers (rack servers).
* Two MX7000 chassis (modular servers).
* Requirement:
* A management application that canholistically manage and monitorstorage, servers, and network environment.
Evaluation of Options
* Option A: iSM (Integrated Dell Remote Access Controller Service Module)
* Explanation:
* iSM is a software module that enhances iDRAC functionality by providing OS-level monitoring and management.
* It is installed on individual servers to facilitate communication between the OS and iDRAC.
* Limitation:
* Not a centralized management application.
* Does not provide holistic management across multiple servers and chassis.
* Conclusion: Not suitable.
* Option B: OME (OpenManage Enterprise)
* Explanation:
* Dell OpenManage Enterpriseis a web-based, one-to-many systems management application.
* Features:
* Provides comprehensive management of Dell EMC servers, storage, and networking devices.
* Supports both rack servers (R660) and modular chassis (MX7000).
* Offers monitoring, configuration, deployment, and update capabilities.
* User-friendly dashboard for holistic infrastructure management.
* Conclusion:Correct Answer.
* Option C: Group Manager
* Explanation:
* Group Manager is an iDRAC feature that allows basic grouping of servers for simplified management.
* Limitations:
* Limited to servers of the same generation and similar configurations.
* Does not support the full range of management functions required.
* Not suitable for managing storage and network environments.
* Conclusion: Not sufficient.
* Option D: OMSA (OpenManage Server Administrator)
* Explanation:
* OMSA is a software agent that provides a comprehensive, one-to-one systems management solution.
* Installed on individual servers to manage and monitor hardware components.
* Limitations:
* Does not provide a centralized, holistic view.
* Lacks the ability to manage multiple servers and chassis collectively.
* Conclusion: Not appropriate.
Dell Operate References
* Server Management and Configuration Tools (14%)
* Explain the management interface options - LCC, racadm, OMSA, iSM, OME:
Understanding the capabilities and limitations of various management tools is essential for selecting the appropriate solution.
* System Administration (18%)
* Group management: OpenManage Enterprise facilitates group management of diverse hardware.
Conclusion
OpenManage Enterprise (OME)is the recommended solution. It provides a unified management console capable of holistically managing and monitoring the customer's storage, server, and network environment, including both rack servers and modular chassis.


NEW QUESTION # 36
Refer to the exhibit.

A technician it installing an OS to a server. The OS array is 2.8TBs. The OS install is unable to start.
What should the technician do to install the OS?

  • A. Switch the Hard Drive boot sequence so that C: is first
  • B. Use LC to install the OS
  • C. Switch the boot settings to UEFI
  • D. Use USB to load Storage Drivers

Answer: A


NEW QUESTION # 37
......


EMC D-PE-OE-23 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Server Components: This section of the exam measures the skills of Dell System Administrators and covers various server components, including processors, memory options, and configurations. It also addresses power options, redundancy features, thermal management, and liquid cooling systems.
Topic 2
  • Server Management and Configuration Tools: This section of the exam measures the skills of Dell Technical Support Engineers and covers the functions of iDRAC, including login procedures and connection methods. It explains various management interface options like LCC and racadm, as well as in-band and out-of-band management techniques.
Topic 3
  • System Administration: This section of the exam measures the skills of Dell System Administrators and covers verifying health status and managing iDRAC licenses.
Topic 4
  • Server Troubleshooting: This section of the exam measures the skills of Dell Technical Support Engineers and covers analyzing visual indicators on server components such as system IDs and power supply units.
Topic 5
  • Server Portfolio and Features: This section of the exam measures the skills of Dell System Administrators and Dell Technical Support Engineers and covers the definitions of chassis form factors and their numbering systems.

 

D-PE-OE-23 dumps Free Test Engine Verified By It Certified Experts: https://pass4sure.examcost.com/D-PE-OE-23-practice-exam.html